Preview
Source Collection
University of North Alabama Archives and Special Collections, Hardy Evans Collection, Collier Library.
Identifier
444
Description
General view of the Wilson Dam's north abutment with blocks one, two, and four completed to 506.
Note: This image is a more clearly captioned version of another image located in this collection called "Train with Construction Materials in Foreground and Construction in Background." Both images were added separately so that viewers could see the detailed captioning included with this image and the clarity of the other image. To easily find the other image in this gallery, simply use the search bar on the left side of the screen and paste its name without the quotation markers or period that follows or click the following link: Train with Construction Materials in Foreground and Construction in Background.
Date Created
8-28-2026
Date
April 1, 1923
Rights
These materials are provided for educational and scholarly purposes, and reproduction of items beyond that allowed for fair use requires the written permission of the copyright owners. The nature of historical archival collections means that copyright or other information about restrictions may be difficult or even impossible to determine. Whenever possible, information is provided about copyright owners and restrictions on materials; however, the responsibility for determining the appropriate use of an item ultimately resides with the patron. The staff is unaware of any copyrights in the digital collections; however, there is a possibility that items may have copyrights associated with them that we were unable to identify. If you are aware of such copyrights, please inform the staff.
Caption that is a more detailed version of the one located at the bottom of the image.
Keywords
Wilson Dam, north abutment
